Operations

Quality control

Inspect the right sample, decide by the numbers and follow up every rejection.

What you get

Sampling plans

Sample size and accept number from the lot size, per item.

Decision from the count

Enter the defects found; the inspection is accepted or rejected for you.

Rejection follow-up

A rejected inspection opens one non-conformance, once.

Pending inspections

Receipts and deliveries waiting for an inspection, oldest first.

Quality analysis

First-pass yield per item, supplier or type, and a defect Pareto.

How it works

  1. Plan

    Give items a sampling plan.

  2. Inspect

    Count defects in the sample.

  3. Follow up

    Work through the non-conformances.

FAQ

Is this the ISO 2859 table?

No. Plans are generated from a stated risk level and are editable, so you can enter the printed table if your customer requires it.

See it on your own data.

A free 30-minute call. A written estimate within 48 hours.